BUSY BEAVER INC. - Industrial Concrete Floor Care Specialists

Home

Markets Served

Chemical Processing

Cold Storage Facilities

Food and Beverage

Logistics/Warehousing

Manufacturing

Parking Garages

Pharmaceutical

Real Estate Management

Industrial Coatings

Acid Resistant Epoxy

Concrete Salt Protection

Conductive Flooring

Cove Base Systems

Epoxy Coatings

Flake Floors

Hardeners/Dust Proofers

Seeded Epoxy Systems

UMC - Urethane Modified

Urethanes

Vinyl Ester Systems

Concrete Polish or Stain

Concrete Polishing

Concrete Staining

Polishing and Staining

Repair Services

Bolt Hole Repair

Cooler/Freezer Repairs

Crack Filling and Rebuild

Epoxy Overlays

Epoxy Mortar Floors

Exterior Concrete Repairs

Joint Filling and Rebuild

Patching

Slab Curl Removal

Slab Undersealing

Urethane Perimeter Caulk

Safety Line Markings

Aisle Markings

Eye Washing Stations

Fire Exit Markings

Inventory Stall Numbering

Inventory Stall Markings

Line Striping Removal

No Stage Markings

Pedestrian Walkways

Rodent Control

Stop Lines

Prep Services

Carpet Removal

Ceiling Dust Removal

Concrete Scrubbing

Mastic Removal

Power Washing

Scarifying

Shot Blasting

Slab Grinding

Tile Removal

About Us

Busy Beaver Approach

Strategic Partners

BBI Value Systems

Case Studies

IL-Exterior Repairs

IL-Warehouse Floor System

IN-Mfg Floor Joint Repair

WI-Floor Coating System

NEW: Ask the Beaver!

BBI's Concrete Compass

Feature Article

Test Your Coatings IQ

Client Stories

Proposal Information Poll

Press Releases

Contact Us

"Known by the floors we protect"

                Crack Filling and Crack Rebuilds

Busy Beaver Inc. offers both crack filling and crack rebuilding as repair services. One thing for certain is that over time concrete will crack. This cracking may be caused by over-loading a concrete slab, inadequate number of control joints, or slab shrinkage. Once identified, these cracks should be repaired quickly and correctly. If the crack is less than one inch, it can be routed and filled with polyurea, a material that has the same consistency as a super ball.

If the crack exceeds more than one inch, the crack must be rebuilt. This process is more involved and costly. In order to rebuild the crack area, the crack needs to be cut out at the widest point, on both sides, and the area between the saw cuts is removed. Next the void is patched with a trowel grade epoxy mortar and is ground smooth.

Contact us today to discuss your crack filling and crack rebuild needs. We will help you develop a repair plan that fits within your time frame and budget.


Crack Filling


Busy Beaver Concrete Floor Crack Filling
Busy Beaver Concrete Floor Crack Filling 2

Crack Rebuild


Busy Beaver Concrete Floor Crack Rebuild
Busy Beaver Concrete Floor Crack Rebuild 2
Document
Crack Filling and Rebuilds
 
 
The Midwest's Leading Flooring Contractor for Concrete Protection, Repair and Restoration

info@busybeaverinc.com